Construction Specifications

  • Western Power safety switch
  • HIA fixed price contract
  • Full working drawings
  • Full indemnity insurance
  • Contour site survey
  • Engineer’s site report
  • Fully engineered concrete slab and footing
  • Shire building permit fees
  • Sewer allowance – 10m past last connection point
  • Water run – 6m past last fixture
  • Allowance for gas run-in
  • 6 months maintenance period
  • Lifetime structural guarantee transferable
  • Ongoing consultation with one of our senior design & sales consultants